December 26: NB Power Inks PPA for J.D. Irving’s 200MW Wind Project
The J.D. Irving wind project took a key step as NB Power signed a deal to buy 200 MW from the Brighton Mountain wind site. Phase one targets 2027, with terms undisclosed. The move aims to ease a projected 2028 supply gap in New Brunswick energy planning. For Canadian investors, this signals steady demand for Atlantic wind. It also highlights permitting risk and the need for grid upgrades. We break down what’s known, what’s missing, and why it matters now.
Continue Reading on Meyka
This article is available in full on our main platform. Get access to complete analysis, stock insights, and more.
Read Full Article →