Hong Kong Ha Kwai House Power Restored; Maintenance Watch — February 17
The Ha Kwai House power outage is resolved. Power at Kwai Chung Estate returned around 1:30 a.m. after a pipe leak triggered a short circuit in the building’s electrical room. The Hong Kong Housing Department handled repairs, while CLP Power Hong Kong said its supply equipment remained normal. About 760 to 800 flats were affected. For investors, this event points to building-level risks, not grid weakness, and may lift maintenance spending across public housing. We outline what to watch and how it could shape demand for contractors and services.
Continue Reading on Meyka
This article is available in full on our main platform. Get access to complete analysis, stock insights, and more.
Read Full Article →